Projects Gallery

Brookhaven Drainage Project

Brookhaven Drainage Project

City of Tuscaloosa, Alabama

Concrete Channel along Cribbs Mill Creek, Hargrove Road Precast Concrete Bridge, Brookhaven Drive Precast Bridge, Pedestrian Bridge and Sidewalks, Demolition of Homes, Site Work, Fencing, and Landscaping. Completed in 2020.
Russell Chapel Road Water Tank

Russell Chapel Road Water Tank

Fayetteville Water Authority

The Russell Chapel Road water tank is a 250,000 gallon bolted steel water tank with ceramic coating. Completed in 2011.
Northwood Lake Spillway

Northwood Lake Spillway

City of Northport, Alabama

Replaced deteriorated concrete channel in local neighborhood to alleviate drainage issues. Completed in 1999.
Haleyville Sports Complex

Haleyville Sports Complex

City of Haleyville, Alabama

Sports Quadplex with Concessions Building
Site Work, Fencing, Lighting, Sidewalks, Irrigation, and Sod. Completed in 2016.
South Well and Treatment Plant

South Well and Treatment Plant

Coker Water Authority

Constructed a 400 GPM groundwater supply well and treatment facility, iron removal, aeration, sedimentation, pressure filters, and chlorine disinfection. Completed in 2012.
Gulf States Well & Treatment Plant

Gulf States Well & Treatment Plant

Chilton Water Authority

Construction of a permitted 1400 GPM well with aeration, disinfection, water storage, high service pumps, and generator. Completed in 2002.
Payne Well

Payne Well

Chilton Water Authority

Constructed a 700 GPM permitted well and pumps at Gulf States Treatment Plant. Completed in 2008.
Thorsby Well No. 7

Thorsby Well No. 7

City of Thorsby, Alabama

Constructed a permitted 700 GPM well to pump water to Well No. 6 and the Treatment Plant. Completed in 2003.
Roy’s Mill Sewer Pump Station

Roy’s Mill Sewer Pump Station

City of Jackson, Alabama

Rehabilitation of 1500 GPM sewer pump station, replacing pumps and controls, and adding a generator. Completed in 2025.
Airport Runway Resurfacing

Airport Runway Resurfacing

City of Haleyville, Alabama

Resurfacing work of airport runway, 100’ wide x 5,000’ long, including milling, binder layer, wearing surface, and striping. Completed in 2023.
Juanita Drive Improvements

Juanita Drive Improvements

City of Tuscaloosa, Alabama

Construction of drainage, street resurfacing, and pedestrian sidewalks in a residential area. Completed in 2024.
500,000 Gallon/Day SBR WWTP

500,000 Gallon/Day SBR WWTP

City of Cordova, Alabama

Constructed a 500,000 GPD SBR wastewater treatment plant with two SBR tanks, a detention tank, screen, and chlorine disinfection. Completed in 2013.